GEBCO regional terrain · ~460 m grid spacing at the equator · not a channel-depth survey
Map tiles could not load. Distances still calculate; inspect the exported route in Google Earth.
READY WHEN YOU ARE
A distance you can inspect.
Search ports and Indonesian facilities, or use coordinates for your terminal. The route connects covered rivers and sea corridors automatically, with estimated estuary links clearly marked. C is optional.
Map geometry checks only; depth and navigation approval are not established.
VESSEL & ACCESS LIMITS
Can this vessel fit?
Preliminary screening
Check your ship or tug-and-barge combination against controlling depths and approved dimensional limits. Unknown data stays unknown.
Select and calculate a route first.
Operating allowances — use your operator / harbour requirements
Use the deepest loaded draft of each hull, including trim and freshwater effects. Squat is a supplied allowance, not an automatic hydrodynamic model. This configuration does not model side-by-side barges, pushing, swept bends or towing capability.
Controlling reaches & terminal limits
Add the river mouth, shallow stretches, bridges and berths that govern this voyage. Blank values are not treated as zero.